
Job Safety Brief
Sat, October 10, 2026
Foreman / Crew Lead
Lance Edwards
Job site
8520 red stone dr east
Type of work
Overhead distribution
Job details
Scope / description
Storm rest, wire down
Crew on site
Lance Edward’s crew
Submitted by
ledwards@american-current.com
Emergency information
Notification person
Lance edwards
Nearest hospital
USA providence hospital
Hospital address
6801 airport blvd, Mobile, Al, 36608
Muster point
Not filled in
Injury hotline
CORE 844-953-8234 (24/7) · 911 for emergencies
Job steps, hazards & safe actions
| # | Job step | Potential hazards | Safe actions |
| 1 | Put signs out |
Traffic |
Not filled in |
| 2 | Put grounds on |
Backfeed |
Not filled in |
Energy isolation
Clearance / control held by
Lance edwards
Hazard controls briefed
Energized Electrical
- Voltage identified / treat as energized until proven otherwise
- Rubber gloves and sleeves inspected, air-tested, and in test date
- Protective grounds / equipotential grounding installed
- Switching, clearance, or hold card obtained and isolation verified
- Test before touch
- Backfeed controlled (customer generators / parallel sources)
Energy Isolation & Control
- Protective grounds installed
- Switch(es) open & tagged
- Voltage tested — verified de-energized
Aerial Lift / Digger Derrick / Crane
- Outriggers set and cribbing used
- Minimum clearance from energized lines maintained
- Insulated boom tested
Climbing & Fall Protection
- Fall restriction / work positioning used
- Harness and lanyard / SRL inspected
- Anchorage point identified
- Secondary attachment in bucket
Ladders
- Inspect before use
- Maintain 3:1 angle
- Use 3-point contact
- Secure ladder at top or bottom
- Use non-conductive ladder near electrical hazards
- Keep ladder away from doors and edges
Work Zone & Traffic Control
- Signs, cones, and flaggers
- High-visibility clothing
- Public / pedestrian protection
Storm & Environmental
- Downed-line / contact procedure reviewed
- Damaged poles and structures assessed
- Generator backfeed controlled
- Night-work lighting
- Fatigue managed
- Heat stress / hydration
- Terrain and right-of-way access
- Chainsaw / vegetation
- Wildlife / insects
Human Performance
- Pre-task planning
- Fit for duty
- Stop and think
- Peer check
- Avoid rushing
- Verify critical steps
- Ask questions
- Job briefing held with all crew (OSHA 1910.269)
Required PPE
Hard hat / Class ESafety glassesFR clothingTested rubber gloves & sleeves (by class)Leather protectorsWork glovesProper footwear (EH-rated)100% fall protection (harness / lanyard / SRL)Voltage detectorTemporary protective groundsSwitch stick / hot stickInsulated line toolsHi-vis traffic vestTraffic cones & signsRespirator
Crew (3)
- Lance Edwards
- Nic Densmore
- Joseph McDonald
2 team member signatures captured · Job briefing acknowledged (OSHA 1910.269)