Job Safety Brief
Sat, October 10, 2026
Foreman / Crew Lead
Michael McNeal
Job site
10787 Fairview st.
Type of work
Overhead distribution + Storm restoration
Job details
Job activity
Storm restoration
Scope / description
Broke poles and wire down
Crew on site
Isreail Rouse
John McKay
Arrow Rouse
Michael McNeal
Jeremiah Llera
Submitted by
mmcneal@american-current.com
Emergency information
Notification person
Michael McNeal
Nearest hospital
Provident hospital
Hospital address
6801 Airport Blvd., Mobile, Al, 36608
Muster point
Seabrook Rd& Fairview St.
Injury hotline
CORE 844-953-8234 (24/7) · 911 for emergencies
Job steps, hazards & safe actions
| # | Job step | Potential hazards | Safe actions |
| 1 | Replace broke poles |
Load suspended in the air |
Catch and secure pole |
| 2 | Pulling up wire |
Wear rubber gloves when handling wire. |
Make sure clearances are in place, ground have been installed, and back feed has been isolated |
Energy isolation
Clearance / control held by
Michael McNeal
Hazard controls briefed
Energized Electrical
- Voltage identified / treat as energized until proven otherwise
- Minimum Approach Distance established and briefed
- Rubber gloves and sleeves inspected, air-tested, and in test date
- Protective grounds / equipotential grounding installed
- Switching, clearance, or hold card obtained and isolation verified
- Test before touch
- Backfeed controlled (customer generators / parallel sources)
Energy Isolation & Control
- Clearance / control in place
- Protective grounds installed
- Switch(es) open & tagged
- Voltage tested — verified de-energized
Aerial Lift / Digger Derrick / Crane
- Equipment inspected
- Outriggers set and cribbing used
- Insulated boom tested
- Spotter used
- Tag lines used
- No personnel under suspended load
Climbing & Fall Protection
- Wood pole inspected and sounded before climbing
- Fall restriction / work positioning used
- Harness and lanyard / SRL inspected
- Anchorage point identified
- Secondary attachment in bucket
- Rescue-at-height plan
Ladders
- Inspect before use
- Maintain 3:1 angle
- Use 3-point contact
- Secure ladder at top or bottom
- Use non-conductive ladder near electrical hazards
- Keep ladder away from doors and edges
Work Zone & Traffic Control
- Traffic control plan in place
- Signs, cones, and flaggers
- High-visibility clothing
- Public / pedestrian protection
Storm & Environmental
- Downed-line / contact procedure reviewed
- Damaged poles and structures assessed
- Generator backfeed controlled
- Fatigue managed
- Heat stress / hydration
- Terrain and right-of-way access
- Chainsaw / vegetation
- Wildlife / insects
Human Performance
- Pre-task planning
- Fit for duty
- Stop and think
- Peer check
- Avoid rushing
- Verify critical steps
- Ask questions
- Job briefing held with all crew (OSHA 1910.269)
Required PPE
Hard hat / Class ESafety glassesFace shield / gogglesFR clothingTested rubber gloves & sleeves (by class)Leather protectorsWork glovesProper footwear (EH-rated)Hearing protection100% fall protection (harness / lanyard / SRL)Voltage detectorTemporary protective groundsSwitch stick / hot stickInsulated line toolsChapsHi-vis traffic vestTraffic cones & signs
Crew (1)
1 team member signature captured · Job briefing acknowledged (OSHA 1910.269) · Inspector: Israel -Rouse