American Current

Job Safety Brief

Mon, October 12, 2026
Foreman / Crew Lead
Michael McNeal
Job site
1215 S Presley St Atmore Al.
Type of work
Storm restoration
JSB index #
—

Job details

Job activity
Restoring power to customers
Scope / description
Broke pole and wire down
Weather
Sunny
Crew on site
McNeal and Edwards Crew
Submitted by
mmcneal@american-current.com

Emergency information

Notification person
Michael McNeal
Backup
Lance Edwards
Radios & cell working
Yes
Nearest hospital
Atmore community hospital
Hospital address
401 Medical Park Dr, Atmore, .Al, 36502
Muster point
Not filled in
Injury hotline
CORE 844-953-8234 (24/7) · 911 for emergencies

Job steps, hazards & safe actions

#Job stepPotential hazardsSafe actions
1Taking control over section of line Someone operating switch while working Tagging pole and installing pole wrap
2Issuing clearance Line being energized or back feed Take clearance over section of line. Isolate all back feed potentials install grounds and wear rubber gloves when handling wire
3Framing and working pole Objects dropped on head Stay clear of the butt of pole while buckets work in the air. If under them let them know. Don’t walk under suspended loads in the air.
4Entergizing customers Bad connection or voltage Check all squeezes inspect that they’re made up good. Verify phases and jumpers are made up correctly so phasing don’t changes down stream.

Energy isolation

Clearance / control held by
Michael McNeal
FR clothing (min.)
CAT 2

Hazard controls briefed

Energized Electrical

  • Voltage identified / treat as energized until proven otherwise
  • Minimum Approach Distance established and briefed
  • Cover-up / rubber goods installed (line hose, blankets, hoods)
  • Rubber gloves and sleeves inspected, air-tested, and in test date
  • Protective grounds / equipotential grounding installed
  • Switching, clearance, or hold card obtained and isolation verified
  • Test before touch
  • Backfeed controlled (customer generators / parallel sources)
  • Step and touch potential controlled

Energy Isolation & Control

  • Clearance / control in place
  • Protective grounds installed
  • Switch(es) open & tagged
  • Voltage tested — verified de-energized

Aerial Lift / Digger Derrick / Crane

  • Equipment inspected
  • Outriggers set and cribbing used
  • Minimum clearance from energized lines maintained
  • Insulated boom tested
  • Spotter used
  • No personnel under suspended load

Climbing & Fall Protection

  • Wood pole inspected and sounded before climbing
  • Fall restriction / work positioning used
  • Harness and lanyard / SRL inspected
  • Anchorage point identified
  • Secondary attachment in bucket
  • Rescue-at-height plan

Ladders

  • Inspect before use
  • Maintain 3:1 angle
  • Use 3-point contact
  • Secure ladder at top or bottom
  • Use non-conductive ladder near electrical hazards
  • Keep ladder away from doors and edges

Underground / Excavation

  • Pothole or hand-dig near utilities

Work Zone & Traffic Control

  • High-visibility clothing
  • Public / pedestrian protection
  • Drop zone barricaded

Storm & Environmental

  • Downed-line / contact procedure reviewed
  • Damaged poles and structures assessed
  • Generator backfeed controlled
  • Fatigue managed
  • Heat stress / hydration
  • Terrain and right-of-way access
  • Chainsaw / vegetation
  • Wildlife / insects

Human Performance

  • Pre-task planning
  • Fit for duty
  • Stop and think
  • Peer check
  • Avoid rushing
  • Verify critical steps
  • Ask questions
  • Job briefing held with all crew (OSHA 1910.269)

Required PPE

Hard hat / Class ESafety glassesFR clothingTested rubber gloves & sleeves (by class)Leather protectorsWork glovesProper footwear (EH-rated)100% fall protection (harness / lanyard / SRL)Voltage detectorTemporary protective groundsSwitch stick / hot stickInsulated line toolsChapsHi-vis traffic vest

Crew (5)

5 team member signatures captured · Job briefing acknowledged (OSHA 1910.269)