American Current

Job Safety Brief

Sat, October 31, 2026
Foreman / Crew Lead
Lance Edwards
Job site
County road 1170
Type of work
Overhead distribution
JSB index #
356

Job details

Job activity
3-56 · Sickles #3
Scope / description
Reconduct
Weather
Cloudy
Crew on site
Lance Edward’s crew and Michael McNeals crew
Submitted by
ledwards@american-current.com

Emergency information

Notification person
Nic densmore
Backup
Lance edwards
Radios & cell working
Yes
Nearest hospital
Weatherford regional hospital
Hospital address
3701 main st, Weatherford, Oklahoma, 73096
Muster point
Not filled in
Injury hotline
CORE 844-953-8234 (24/7) · 911 for emergencies

Job steps, hazards & safe actions

No job steps were written on this JSB.

Energy isolation

Clearance / control held by
Mikey mcneil
FR clothing (min.)
CAT 2

Hazard controls briefed

Energized Electrical

  • Voltage identified / treat as energized until proven otherwise
  • Minimum Approach Distance established and briefed
  • Cover-up / rubber goods installed (line hose, blankets, hoods)
  • Rubber gloves and sleeves inspected, air-tested, and in test date
  • Protective grounds / equipotential grounding installed
  • Switching, clearance, or hold card obtained and isolation verified
  • Test before touch
  • Backfeed controlled (customer generators / parallel sources)
  • Step and touch potential controlled

Energy Isolation & Control

  • Energized work permit obtained
  • Control of switching devices confirmed
  • Clearance / control in place
  • Protective grounds installed
  • Switch(es) open & tagged
  • Voltage tested — verified de-energized

Aerial Lift / Digger Derrick / Crane

  • Equipment inspected
  • Outriggers set and cribbing used
  • Minimum clearance from energized lines maintained
  • Insulated boom tested
  • Spotter used
  • No personnel under suspended load

Climbing & Fall Protection

  • Wood pole inspected and sounded before climbing
  • Fall restriction / work positioning used
  • Harness and lanyard / SRL inspected
  • Anchorage point identified
  • Secondary attachment in bucket
  • Rescue-at-height plan

Ladders

  • Inspect before use
  • Maintain 3:1 angle
  • Use 3-point contact
  • Secure ladder at top or bottom
  • Use non-conductive ladder near electrical hazards
  • Keep ladder away from doors and edges

Work Zone & Traffic Control

  • Traffic control plan in place
  • Signs, cones, and flaggers
  • High-visibility clothing

Human Performance

  • Pre-task planning
  • Fit for duty
  • Stop and think
  • Peer check
  • Avoid rushing
  • Verify critical steps
  • Ask questions
  • Job briefing held with all crew (OSHA 1910.269)

Required PPE

Hard hat / Class ESafety glassesFR clothingTested rubber gloves & sleeves (by class)Leather protectorsWork glovesProper footwear (EH-rated)100% fall protection (harness / lanyard / SRL)Voltage detectorTemporary protective groundsSwitch stick / hot stickInsulated line toolsHi-vis traffic vestTraffic cones & signs

Permits

Hot Work Permit

Crew (8)

8 team member signatures captured · Job briefing acknowledged (OSHA 1910.269)