American Current

Job Safety Brief

Sun, November 1, 2026
Foreman / Crew Lead
Michael McNeal
Job site
11200 CR-1160
Type of work
Overhead distribution
JSB index #
1

Job details

Job activity
Moving wire, pulling poles, framing poles, checking voltage and rotation.
Scope / description
Pick and stick poles, framing and setting
Weather
Foggy and cloudy
Crew on site
McNeal and Edwards crew
Submitted by
michaelmcneal@american-current.com

Emergency information

Notification person
Michael McNeal
Backup
Isreal Rouse
Radios & cell working
Yes
Nearest hospital
Weatherford Regional Hospital
Hospital address
3701 E Main St, Weatherford, OK, 73096
Muster point
Not filled in
Injury hotline
CORE 844-953-8234 (24/7) · 911 for emergencies

Job steps, hazards & safe actions

#Job stepPotential hazardsSafe actions
1Removing three pot bank Not checking voltage and rotation Check voltage and rotation before and after removing and installing
2Moving primary Entergized primary, improper cover up, bad arm or pole up and down stream Keep distance between phases, cover up work area properly, check structures up and down stream before moving wire.
3Framing and setting poles Entergized primary, pole coming Entergized, getting in pinch points Cover primary before setting pole, look up and down the line when moving wire, keep hands and body out of pinch points.

Energy isolation

Clearance / control held by
Michael McNeal
FR clothing (min.)
CAT 2

Hazard controls briefed

Energized Electrical

  • Voltage identified / treat as energized until proven otherwise
  • Minimum Approach Distance established and briefed
  • Cover-up / rubber goods installed (line hose, blankets, hoods)
  • Rubber gloves and sleeves inspected, air-tested, and in test date
  • Switching, clearance, or hold card obtained and isolation verified
  • Backfeed controlled (customer generators / parallel sources)

Energy Isolation & Control

  • Energized work permit obtained

Aerial Lift / Digger Derrick / Crane

  • Equipment inspected
  • Outriggers set and cribbing used
  • Insulated boom tested
  • Spotter used
  • Tag lines used
  • No personnel under suspended load

Climbing & Fall Protection

  • Wood pole inspected and sounded before climbing
  • Fall restriction / work positioning used
  • Harness and lanyard / SRL inspected
  • Anchorage point identified
  • Secondary attachment in bucket
  • Rescue-at-height plan

Ladders

  • Inspect before use
  • Maintain 3:1 angle
  • Use 3-point contact
  • Secure ladder at top or bottom
  • Use non-conductive ladder near electrical hazards
  • Keep ladder away from doors and edges

Underground / Excavation

  • Other

Work Zone & Traffic Control

  • Traffic control plan in place
  • Signs, cones, and flaggers
  • High-visibility clothing
  • Public / pedestrian protection

Storm & Environmental

  • Downed-line / contact procedure reviewed
  • Damaged poles and structures assessed
  • Night-work lighting
  • Fatigue managed
  • Heat stress / hydration
  • Terrain and right-of-way access
  • Chainsaw / vegetation
  • Wildlife / insects

Human Performance

  • Pre-task planning
  • Fit for duty
  • Stop and think
  • Peer check
  • Verify critical steps
  • Ask questions
  • Job briefing held with all crew (OSHA 1910.269)

Required PPE

Hard hat / Class ESafety glassesFR clothingTested rubber gloves & sleeves (by class)Leather protectorsWork glovesProper footwear (EH-rated)100% fall protection (harness / lanyard / SRL)Voltage detectorSwitch stick / hot stickInsulated line toolsHi-vis traffic vestTraffic cones & signs

Permits

Hot Work Permit

Crew (6)

6 team member signatures captured · Job briefing acknowledged (OSHA 1910.269)